Dualization of Akure-Ilesa Highway (Phase 2) - Infrastructure Works
English, French, Portuguese or Arabic, machine translated, with the original kept beside it.
This tender is closed
The deadline was Jul 20, 2026. This page stays online as a record of the call.
Keeps its status, your notes and a checklist on your tracker, and it can be shared with the people bidding with you.
Keeps it on your saved list, and its closing date on your deadline calendar. No status, no checklist and nobody else sees it.
Scope of Work
Project Scope:
Full-scale engineering construction for the dualization of 45km of highway.
Deliverables:
Full-scale engineering construction for the dualization of 45km of highway.
Deliverables:
- Earthworks, site clearance, and sub-base stabilization.
- Laying of asphaltic concrete (binder and wearing courses).
- Construction of 3 reinforced concrete bridges and 12 culverts.
- Installation of solar-powered street lighting and road signage.
Requirements & Qualifications
Qualification Criteria:
- Registration: Must be registered with the BPP National Database.
- Financial: Average annual construction turnover of NGN 5 Billion.
- Equipment: Proof of ownership of asphalt plants, pavers, and heavy excavators.
- Personnel: Project Manager must be a COREN registered Civil Engineer with 15+ years experience.