Construction of Kerouane 225/30 kV Substation, PIEGM

Engineering, supply and construction of the Kerouane 225/30 kV substation under the Guinea-Mali Electricity Interconnection Project (PIEGM), financed by IDA credits 62610 and D3360.

English, French, Portuguese or Arabic, machine translated, with the original kept beside it.
Key Information
Awarded by
Electricite de Guinee (EDG)
Location
Upper Guinea, Kerouane Prefecture, Guinea
Status
Awarded
Category
Works
Award Amount
USD 15,218,984
Size
mega
Reference
P166042-WORKS-SUBSTATION-KEROUANE
Language
English
Contract End
Feb 28, 2025

Overview

Works contract under the Guinea-Mali Interconnection Project (P166042). Scope covers design, supply and installation of high-voltage equipment including a 225/30 kV transformer, switchgear, control and protection systems, and commissioning of the Kerouane substation. Initial contract value USD 10,560,000.00, with a price adjustment of USD 4,658,983.59 representing 44.11 percent of the initial contract. As of 30 September 2024 the work progress stood at 65.39 percent. The main equipment of the substation, including the transformer, was already delivered on site in March 2023. Completion of works is scheduled for 28 February 2025. Contractor name not disclosed in the public Implementation Status Report.

Scope of Work

Design, supply and installation of 225/30 kV transformer and high-voltage switchgear, control and protection systems, civil works, commissioning, and operator training for the Kerouane substation.

Selection Criteria